{"id":6041,"date":"2026-08-17T12:39:41","date_gmt":"2026-08-17T09:39:41","guid":{"rendered":"https:\/\/portofnaantali.fi\/?p=6041"},"modified":"2026-08-17T12:39:41","modified_gmt":"2026-08-17T09:39:41","slug":"traffic-congestion-expected-on-the-turku-ring-road-in-raisio-from-20-august-as-blasting-works-begin","status":"publish","type":"post","link":"https:\/\/portofnaantali.fi\/en\/news\/traffic-congestion-expected-on-the-turku-ring-road-in-raisio-from-20-august-as-blasting-works-begin\/","title":{"rendered":"Traffic Congestion Expected on the Turku Ring Road in Raisio from 20 August as Blasting Works Begin\u00a0"},"content":{"rendered":"<p><span data-contrast=\"auto\">Blasting works will begin on Thursday, 20 August, in Raisio town centre along the E18 Turku Ring Road, causing occasional traffic stoppages and congestion.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:0,&quot;335551620&quot;:0,&quot;335559738&quot;:210,&quot;335559739&quot;:210,&quot;335559740&quot;:300}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">As part of the Finnish Transport Infrastructure Agency\u2019s E18 Raisio Town Centre project, a temporary road serving the future tunnel construction site is currently being built. The blasting operations will take place on the worksite west of the Turku Ring Road (Nesteentie), between Soliniuksenkuja and Juhaninkuja.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:0,&quot;335551620&quot;:0,&quot;335559738&quot;:210,&quot;335559739&quot;:210,&quot;335559740&quot;:300}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">The work will start with rock drilling on Thursday, 20 August, and blasting operations will commence on Monday, 24 August.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:0,&quot;335551620&quot;:0,&quot;335559738&quot;:210,&quot;335559739&quot;:210,&quot;335559740&quot;:300}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">For safety reasons, traffic on the Ring Road will be temporarily stopped during blasting. The stoppages will be announced with audible warning signals, and traffic controllers on site will manage the closures. Each individual traffic stop will last no more than eight minutes.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:0,&quot;335551620&quot;:0,&quot;335559738&quot;:210,&quot;335559739&quot;:210,&quot;335559740&quot;:300}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">The excavation and blasting works may cause occasional noise disturbance. The impact of the work on nearby properties will be monitored through vibration measurements.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:0,&quot;335551620&quot;:0,&quot;335559738&quot;:210,&quot;335559739&quot;:210,&quot;335559740&quot;:300}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">Work will be carried out on weekdays between 7:00 a.m. and 6:00 p.m., and blasting operations requiring traffic stoppages will be scheduled, whenever possible, outside the morning and afternoon peak traffic periods.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:0,&quot;335551620&quot;:0,&quot;335559738&quot;:210,&quot;335559739&quot;:210,&quot;335559740&quot;:300}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">The excavation works are expected to be completed during September.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:0,&quot;335551620&quot;:0,&quot;335559738&quot;:210,&quot;335559739&quot;:210,&quot;335559740&quot;:300}\">\u00a0<\/span><\/p>\n<p><i><span data-contrast=\"auto\">Source: Finnish Transport Infrastructure Agency press release, 14 August 2026 \/ 17 August 2026<\/span><\/i><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:0,&quot;335551620&quot;:0,&quot;335559738&quot;:210,&quot;335559739&quot;:210,&quot;335559740&quot;:300}\">\u00a0<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Blasting works will begin on Thursday, 20 August, in Raisio town centre along the E18 Turku Ring Road, causing occasional traffic stoppages and congestion.\u00a0 As part of the Finnish Transport Infrastructure Agency\u2019s E18 Raisio Town Centre project, a temporary road serving the future tunnel construction site is currently being built. The blasting operations will take&hellip;<\/p>\n","protected":false},"author":3,"featured_media":6044,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[25],"tags":[],"class_list":["post-6041","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Traffic Congestion Expected on the Turku Ring Road in Raisio from 20 August as Blasting Works Begin\u00a0 - Port of Naantali<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/portofnaantali.fi\/en\/news\/traffic-congestion-expected-on-the-turku-ring-road-in-raisio-from-20-august-as-blasting-works-begin\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Traffic Congestion Expected on the Turku Ring Road in Raisio from 20 August as Blasting Works Begin\u00a0 - Port of Naantali\" \/>\n<meta property=\"og:description\" content=\"Blasting works will begin on Thursday, 20 August, in Raisio town centre along the E18 Turku Ring Road, causing occasional traffic stoppages and congestion.\u00a0 As part of the Finnish Transport Infrastructure Agency\u2019s E18 Raisio Town Centre project, a temporary road serving the future tunnel construction site is currently being built. The blasting operations will take&hellip;\" \/>\n<meta property=\"og:url\" content=\"https:\/\/portofnaantali.fi\/en\/news\/traffic-congestion-expected-on-the-turku-ring-road-in-raisio-from-20-august-as-blasting-works-begin\/\" \/>\n<meta property=\"og:site_name\" content=\"Port of Naantali\" \/>\n<meta property=\"article:published_time\" content=\"2026-08-17T09:39:41+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/portofnaantali.fi\/wp-content\/uploads\/2026\/08\/pic_5_7058722_12947923_1200-2.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"660\" \/>\n\t<meta property=\"og:image:height\" content=\"438\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Tarja Siekkinen\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Tarja Siekkinen\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/portofnaantali.fi\\\/en\\\/news\\\/traffic-congestion-expected-on-the-turku-ring-road-in-raisio-from-20-august-as-blasting-works-begin\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/portofnaantali.fi\\\/en\\\/news\\\/traffic-congestion-expected-on-the-turku-ring-road-in-raisio-from-20-august-as-blasting-works-begin\\\/\"},\"author\":{\"name\":\"Tarja Siekkinen\",\"@id\":\"https:\\\/\\\/portofnaantali.fi\\\/en\\\/#\\\/schema\\\/person\\\/eece7bb2db0ce33c8711f32265e27501\"},\"headline\":\"Traffic Congestion Expected on the Turku Ring Road in Raisio from 20 August as Blasting Works Begin\u00a0\",\"datePublished\":\"2026-08-17T09:39:41+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/portofnaantali.fi\\\/en\\\/news\\\/traffic-congestion-expected-on-the-turku-ring-road-in-raisio-from-20-august-as-blasting-works-begin\\\/\"},\"wordCount\":222,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/portofnaantali.fi\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/portofnaantali.fi\\\/en\\\/news\\\/traffic-congestion-expected-on-the-turku-ring-road-in-raisio-from-20-august-as-blasting-works-begin\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/portofnaantali.fi\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/pic_5_7058722_12947923_1200-2.jpg\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/portofnaantali.fi\\\/en\\\/news\\\/traffic-congestion-expected-on-the-turku-ring-road-in-raisio-from-20-august-as-blasting-works-begin\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/portofnaantali.fi\\\/en\\\/news\\\/traffic-congestion-expected-on-the-turku-ring-road-in-raisio-from-20-august-as-blasting-works-begin\\\/\",\"url\":\"https:\\\/\\\/portofnaantali.fi\\\/en\\\/news\\\/traffic-congestion-expected-on-the-turku-ring-road-in-raisio-from-20-august-as-blasting-works-begin\\\/\",\"name\":\"Traffic Congestion Expected on the Turku Ring Road in Raisio from 20 August as Blasting Works Begin\u00a0 - Port of Naantali\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/portofnaantali.fi\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/portofnaantali.fi\\\/en\\\/news\\\/traffic-congestion-expected-on-the-turku-ring-road-in-raisio-from-20-august-as-blasting-works-begin\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/portofnaantali.fi\\\/en\\\/news\\\/traffic-congestion-expected-on-the-turku-ring-road-in-raisio-from-20-august-as-blasting-works-begin\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/portofnaantali.fi\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/pic_5_7058722_12947923_1200-2.jpg\",\"datePublished\":\"2026-08-17T09:39:41+00:00\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/portofnaantali.fi\\\/en\\\/news\\\/traffic-congestion-expected-on-the-turku-ring-road-in-raisio-from-20-august-as-blasting-works-begin\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/portofnaantali.fi\\\/en\\\/news\\\/traffic-congestion-expected-on-the-turku-ring-road-in-raisio-from-20-august-as-blasting-works-begin\\\/#primaryimage\",\"url\":\"https:\\\/\\\/portofnaantali.fi\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/pic_5_7058722_12947923_1200-2.jpg\",\"contentUrl\":\"https:\\\/\\\/portofnaantali.fi\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/pic_5_7058722_12947923_1200-2.jpg\",\"width\":660,\"height\":438,\"caption\":\"Blasting works will begin on Thursday, 20 August, in Raisio town centre along the E18 Turku Ring Road, causing occasional traffic stoppages and congestion.\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/portofnaantali.fi\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/portofnaantali.fi\\\/en\\\/\",\"name\":\"Port of Naantali\",\"description\":\"The port never sleeps\",\"publisher\":{\"@id\":\"https:\\\/\\\/portofnaantali.fi\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/portofnaantali.fi\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/portofnaantali.fi\\\/en\\\/#organization\",\"name\":\"Port of Naantali\",\"url\":\"https:\\\/\\\/portofnaantali.fi\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/portofnaantali.fi\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/portofnaantali.fi\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/logo-englanti-pysty-satamansininen.png\",\"contentUrl\":\"https:\\\/\\\/portofnaantali.fi\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/logo-englanti-pysty-satamansininen.png\",\"width\":756,\"height\":500,\"caption\":\"Port of Naantali\"},\"image\":{\"@id\":\"https:\\\/\\\/portofnaantali.fi\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/portofnaantali.fi\\\/en\\\/#\\\/schema\\\/person\\\/eece7bb2db0ce33c8711f32265e27501\",\"name\":\"Tarja Siekkinen\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/baafd9cfef86d8b455a80eb8943030aa03f039e5450a794f2f3a5c235632957b?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/baafd9cfef86d8b455a80eb8943030aa03f039e5450a794f2f3a5c235632957b?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/baafd9cfef86d8b455a80eb8943030aa03f039e5450a794f2f3a5c235632957b?s=96&d=mm&r=g\",\"caption\":\"Tarja Siekkinen\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Traffic Congestion Expected on the Turku Ring Road in Raisio from 20 August as Blasting Works Begin\u00a0 - Port of Naantali","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/portofnaantali.fi\/en\/news\/traffic-congestion-expected-on-the-turku-ring-road-in-raisio-from-20-august-as-blasting-works-begin\/","og_locale":"en_US","og_type":"article","og_title":"Traffic Congestion Expected on the Turku Ring Road in Raisio from 20 August as Blasting Works Begin\u00a0 - Port of Naantali","og_description":"Blasting works will begin on Thursday, 20 August, in Raisio town centre along the E18 Turku Ring Road, causing occasional traffic stoppages and congestion.\u00a0 As part of the Finnish Transport Infrastructure Agency\u2019s E18 Raisio Town Centre project, a temporary road serving the future tunnel construction site is currently being built. The blasting operations will take&hellip;","og_url":"https:\/\/portofnaantali.fi\/en\/news\/traffic-congestion-expected-on-the-turku-ring-road-in-raisio-from-20-august-as-blasting-works-begin\/","og_site_name":"Port of Naantali","article_published_time":"2026-08-17T09:39:41+00:00","og_image":[{"width":660,"height":438,"url":"https:\/\/portofnaantali.fi\/wp-content\/uploads\/2026\/08\/pic_5_7058722_12947923_1200-2.jpg","type":"image\/jpeg"}],"author":"Tarja Siekkinen","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Tarja Siekkinen","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/portofnaantali.fi\/en\/news\/traffic-congestion-expected-on-the-turku-ring-road-in-raisio-from-20-august-as-blasting-works-begin\/#article","isPartOf":{"@id":"https:\/\/portofnaantali.fi\/en\/news\/traffic-congestion-expected-on-the-turku-ring-road-in-raisio-from-20-august-as-blasting-works-begin\/"},"author":{"name":"Tarja Siekkinen","@id":"https:\/\/portofnaantali.fi\/en\/#\/schema\/person\/eece7bb2db0ce33c8711f32265e27501"},"headline":"Traffic Congestion Expected on the Turku Ring Road in Raisio from 20 August as Blasting Works Begin\u00a0","datePublished":"2026-08-17T09:39:41+00:00","mainEntityOfPage":{"@id":"https:\/\/portofnaantali.fi\/en\/news\/traffic-congestion-expected-on-the-turku-ring-road-in-raisio-from-20-august-as-blasting-works-begin\/"},"wordCount":222,"commentCount":0,"publisher":{"@id":"https:\/\/portofnaantali.fi\/en\/#organization"},"image":{"@id":"https:\/\/portofnaantali.fi\/en\/news\/traffic-congestion-expected-on-the-turku-ring-road-in-raisio-from-20-august-as-blasting-works-begin\/#primaryimage"},"thumbnailUrl":"https:\/\/portofnaantali.fi\/wp-content\/uploads\/2026\/08\/pic_5_7058722_12947923_1200-2.jpg","articleSection":["News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/portofnaantali.fi\/en\/news\/traffic-congestion-expected-on-the-turku-ring-road-in-raisio-from-20-august-as-blasting-works-begin\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/portofnaantali.fi\/en\/news\/traffic-congestion-expected-on-the-turku-ring-road-in-raisio-from-20-august-as-blasting-works-begin\/","url":"https:\/\/portofnaantali.fi\/en\/news\/traffic-congestion-expected-on-the-turku-ring-road-in-raisio-from-20-august-as-blasting-works-begin\/","name":"Traffic Congestion Expected on the Turku Ring Road in Raisio from 20 August as Blasting Works Begin\u00a0 - Port of Naantali","isPartOf":{"@id":"https:\/\/portofnaantali.fi\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/portofnaantali.fi\/en\/news\/traffic-congestion-expected-on-the-turku-ring-road-in-raisio-from-20-august-as-blasting-works-begin\/#primaryimage"},"image":{"@id":"https:\/\/portofnaantali.fi\/en\/news\/traffic-congestion-expected-on-the-turku-ring-road-in-raisio-from-20-august-as-blasting-works-begin\/#primaryimage"},"thumbnailUrl":"https:\/\/portofnaantali.fi\/wp-content\/uploads\/2026\/08\/pic_5_7058722_12947923_1200-2.jpg","datePublished":"2026-08-17T09:39:41+00:00","inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/portofnaantali.fi\/en\/news\/traffic-congestion-expected-on-the-turku-ring-road-in-raisio-from-20-august-as-blasting-works-begin\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/portofnaantali.fi\/en\/news\/traffic-congestion-expected-on-the-turku-ring-road-in-raisio-from-20-august-as-blasting-works-begin\/#primaryimage","url":"https:\/\/portofnaantali.fi\/wp-content\/uploads\/2026\/08\/pic_5_7058722_12947923_1200-2.jpg","contentUrl":"https:\/\/portofnaantali.fi\/wp-content\/uploads\/2026\/08\/pic_5_7058722_12947923_1200-2.jpg","width":660,"height":438,"caption":"Blasting works will begin on Thursday, 20 August, in Raisio town centre along the E18 Turku Ring Road, causing occasional traffic stoppages and congestion."},{"@type":"WebSite","@id":"https:\/\/portofnaantali.fi\/en\/#website","url":"https:\/\/portofnaantali.fi\/en\/","name":"Port of Naantali","description":"The port never sleeps","publisher":{"@id":"https:\/\/portofnaantali.fi\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/portofnaantali.fi\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/portofnaantali.fi\/en\/#organization","name":"Port of Naantali","url":"https:\/\/portofnaantali.fi\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/portofnaantali.fi\/en\/#\/schema\/logo\/image\/","url":"https:\/\/portofnaantali.fi\/wp-content\/uploads\/2026\/04\/logo-englanti-pysty-satamansininen.png","contentUrl":"https:\/\/portofnaantali.fi\/wp-content\/uploads\/2026\/04\/logo-englanti-pysty-satamansininen.png","width":756,"height":500,"caption":"Port of Naantali"},"image":{"@id":"https:\/\/portofnaantali.fi\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/portofnaantali.fi\/en\/#\/schema\/person\/eece7bb2db0ce33c8711f32265e27501","name":"Tarja Siekkinen","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/baafd9cfef86d8b455a80eb8943030aa03f039e5450a794f2f3a5c235632957b?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/baafd9cfef86d8b455a80eb8943030aa03f039e5450a794f2f3a5c235632957b?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/baafd9cfef86d8b455a80eb8943030aa03f039e5450a794f2f3a5c235632957b?s=96&d=mm&r=g","caption":"Tarja Siekkinen"}}]}},"_links":{"self":[{"href":"https:\/\/portofnaantali.fi\/en\/wp-json\/wp\/v2\/posts\/6041","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/portofnaantali.fi\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/portofnaantali.fi\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/portofnaantali.fi\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/portofnaantali.fi\/en\/wp-json\/wp\/v2\/comments?post=6041"}],"version-history":[{"count":1,"href":"https:\/\/portofnaantali.fi\/en\/wp-json\/wp\/v2\/posts\/6041\/revisions"}],"predecessor-version":[{"id":6045,"href":"https:\/\/portofnaantali.fi\/en\/wp-json\/wp\/v2\/posts\/6041\/revisions\/6045"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/portofnaantali.fi\/en\/wp-json\/wp\/v2\/media\/6044"}],"wp:attachment":[{"href":"https:\/\/portofnaantali.fi\/en\/wp-json\/wp\/v2\/media?parent=6041"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/portofnaantali.fi\/en\/wp-json\/wp\/v2\/categories?post=6041"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/portofnaantali.fi\/en\/wp-json\/wp\/v2\/tags?post=6041"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}